4:35. A
MacMBA 116
Memorandum.
I have read the Report of the Committee ordered to inspect the Godown lately purchased.
Messrs Jardine Matheson &...
from transverse Walls
C
Instead of the radical and expensive alterations which the Committee suggest, I think that the weakness which is shown to exist in the flooring of the upper story might be effectually and speedily remedied... by building as thick as the present Pillars under the cross Beams of the upper Story, so as to divide the ground Floor into different divisions, all of which might be connected by arched Door ways, and further that the stone Pillars that have been lately added, might be carried up from the Floor of the upper story to the Cross Beams of the Roof, so as to afford them additional
Copy)
4:35. A
MacMBA 116
Memorandum.
I have read the Report of the Committee ordered to inspect the Godown lately purchased.
Messrs Jardine Matheson &.....
from
transverse Walls
C
Instead of the radical and expensive. alterations which the Committee suggest, I thints. that the weakness which is shown to exist _ in the floring of the upper story might be effectually and - speedily remedied... by building as thick as the present - Pillars under the cross Beams of the upper. Story, so as to divide the ground Floor into different - divisions, all of which might be connected. by arched Door ways, and further that the stone Pillars that have been lately added, might be carried up from the Floor of the upper story to the. Cross Beams of the Roof, so as to afford.
them
additional
No comments yet.
Private notes are available after approval.